Skip to content
Hydel Energy

Hydel Energy

  • Home
  • Hydropower
  • Renewable Energy
  • Research and Analysis
  • Hydropower Calculation Tools
  • Connect with Hydel Energy
  • About
Hydel Energy
Hydel Energy
  • Hydropower

    Turbine Selection Chart — Head vs Flow Calculator | Hydel Energy

    ByHydel Engineer

    Every hydropower scheme reaches the same question once the survey work is done: the site gives you a head and a flow, so which turbine actually suits it?The answer has been drawn as a turbine selection chart for decades.

    Head on one axis, flow on the other, both logarithmic, with an envelope marking the working range of each runner type. Every manufacturer publishes a version. Most of them are static PDFs that you squint at, trying to locate your site somewhere between the gridlines.

    This is that chart, made interactive. Enter your net head and design flow, or drag the point, and every envelope covering that duty lights up — along with the electrical output, the estimated annual energy, and a note on what each runner type would mean in practice.

    Read More Turbine Selection Chart — Head vs Flow Calculator | Hydel EnergyContinue

  • Ongoing Hydel (Hydropower) Projects in Nepal
    Global Energy - Hydropower - Research and Analysis

    Ongoing Hydel (Hydropower) Projects in Nepal — Upper Tamakoshi, Upper Karnali and the Road Ahead

    ByHydel Engineer

    Nepal’s hydel (hydropower) sector is entering a new phase. With Upper Trishuli-1 already covered in earlier coverage of the country’s project pipeline, two other developments now define where Nepal’s generation capacity is headed: Upper Tamakoshi, the country’s largest operating plant, and Upper Karnali, its largest project under construction. Together with Upper Trishuli-1, these three complete a working picture of Nepal’s hydel buildout — from commissioned asset, to resilience-tested operator, to a project still working through financial closure.

    Read More Ongoing Hydel (Hydropower) Projects in Nepal — Upper Tamakoshi, Upper Karnali and the Road AheadContinue

  • Research and Analysis - Hydropower - Pakistan Energy

    Upcoming Hydel (Hydropower) Projects in Pakistan — The Complete 2026 Pipeline

    ByHydel Engineer

    Pakistan holds one of the largest untapped hydel (hydropower) resources in the world — an estimated 60,000MW of gross potential, of which only around 10,635MW has been developed to date. That means roughly 82% of the country’s economically viable hydel potential remains unharnessed. Yet Pakistan is now in the middle of its most significant hydel construction phase in decades, with several mega projects under simultaneous development that will collectively double the nation’s hydropower capacity by 2030. This guide covers the major upcoming and under-construction hydel projects in Pakistan — their capacity, location, status, financing and the engineering and infrastructure realities that shape their timelines — building on our earlier overview of Pakistan’s broader hydel sector.

    Read More Upcoming Hydel (Hydropower) Projects in Pakistan — The Complete 2026 PipelineContinue

© 2026 Hydel Energy . All rights reserved

  • Home
  • Hydropower
  • Renewable Energy
  • Research and Analysis
  • Hydropower Calculation Tools
  • Connect with Hydel Energy
  • About